Description:
Formal Dress
Fabric: Chiffon
Hand Embroidered: Chiffon Body (Front, Back Sides & Sleeves)
Grip Daman and Sleeves Patch. Paired wi
Note: All dresses are made to order and the making of formal requires a time period of approx., 2 to 3 weeks.
Reviews
There are no reviews yet.